Description
CP1-SP-012
Hand Tool Overhaul and Refurbishment including 10ft Cable Replacement
Refurbishment to include replacement of internal seals, bearings, circuitry, stepper motor, replacement cable; incorporation of reliability updates as available, and a full functional test of the rebuilt unit
– Turn-around time is within one week
– Equipment to be repaired on a return-to-factory basis
– 1-year warranty on replacement parts and labor