Emptying the Sediment Tank – E-Drill 1.0

Back to E-Drill Academy

In this section, we empty the sediment tank. This maintenance needs to be performed every 1500 cuts. You will see a 500 cut countdown appear at 1000 cuts(500 cuts left until the system locks). Once the countdown ends the system will remain locked until you run the maintenance and reset the counter.

As always, for most maintenance functions, consult the five-step guide on the lid of your tool-cart and the Maintenance and Troubleshooting Booklet in your maintenance kit in the toolcart.