3: Building the E-Drill System

YouTube video

Thanks for joining our new, comprehensive, E-drill Training and Maintenance Course. In this section, we will go through uncrating, building the system, doing an initial fill of the water system, and getting it ready to perform a cut.

As always, when actually removing the fastener consult the five-step guide on the lid of your tool-cart and the Fastener Specific Removal Instruction Booklet that was sent to you in your maintenance kit.

To find all of our training and maintenance videos, user guide downloads and new E-drill products, visit: ppedm.com/support/training-videos/

Or call our support team to get an E-drill Support Specialist to help you right away: (714) 892-3400 – ppedm.com/support/contact-us/

Related Videos