FORGOT YOUR DETAILS?

Hand Tool Overhaul and Refurbishment Including 30ft Cable Replacement

CP1-SP-013

Refurbishment to include replacement of internal seals, bearings, circuitry, stepper motor, replacement cable; incorporation of reliability updates as available, and a full functional test of the rebuilt unit

Description

CP1-SP-013

Hand Tool Overhaul and Refurbishment including 30ft Cable Replacement

Refurbishment to include replacement of internal seals, bearings, circuitry, stepper motor, replacement cable; incorporation of reliability updates as available, and a full functional test of the rebuilt unit
– Turn-around time is within one week
– Equipment to be repaired on a return-to-factory basis
– 1-year warranty on replacement parts and labor

TOP